Projects delivered to clients, with real data and verified results.
-
East and west arrays: 15.15 kWp for the whole day at Campocheio
15.15 kWp at a commercial space in Figueiró, with 30 panels across east- and west-facing strings. A business consumes all day, so generation follows it: east in the morning, west in the afternoon.
-
Solar and BYD batteries in freeze-drying: the Liofood project
25.92 kWp of solar and 12.80 kWh of BYD storage at a freeze-drying facility. 44% of demand met by on-site generation and an estimated 55% cut in electricity costs.
-
Off-grid in Carregal do Sal: a home with no grid connection
7.07 kWp off-grid system with 10.6 kWh of Weco storage and Victron Energy management at a home with no grid access in Carregal do Sal. Generate, store and manage, no connection and no compromise: full autonomy.
-
Flat roof, zero penetrations: all-European solar in Zona Centro
3.6 kWp on a flat asphalt-membrane roof with zero penetrations, on Esdec's ballasted FlatFix Fusion structure. 100% European equipment: Meyer Burger, SMA and Esdec. When the brief is not to touch the roof, the solution stops being generic.
-
250 kWp hybrid in Évora: Almencor decides when to use the grid
250 kWp hybrid system with 30 kWh of storage at an industrial facility in Évora. Generate, store and, when needed, run islanded from the grid: energy as strategic infrastructure.
-
Solar and EV charging in a single day: Acampamento Baptista
16 kWp of solar, a 22 kW EV charger and efficiency measures at a tourism site in Água de Madeiros, installed in a single day and built to grow.
-
Enphase microinverters at a Viseu home: Colina Verde
Enphase microinverters on a 1.6 kWp residential system at a home in Colina Verde, Viseu. Compact, efficient and ready to grow with the house. Energy independence doesn't require a big install.
-
Repowering at Viseu's WWTP: new life for a system that can't fail
Repowering and optimisation of an ageing solar system at Viseu's wastewater treatment plant. At a facility that runs every day of the year, restoring efficiency and reliability is a form of responsibility.
-
Six chargers for an electric fleet: Grupo FTD Terras do Demo
Six EV charging points for the Grupo FTD Terras do Demo fleet in Armamar, with an upfront energy audit to shape the next round of efficiency investments.
-
Repowered to 11 kWp in Serra da Estrela: Quinta do Quinto
Photovoltaic system expanded by repowering to 11.03 kWp at a rural tourism estate in Serra da Estrela. When the estate grew, the system grew with it, without starting from scratch.
-
Solar, LED and a heat pump: zero gas at Rugby Clube de Tondela
Three answers for a sports club: 4 kWp of solar, 32 floodlights swapped for LED and a 12 kW Panasonic heat pump with a 3,000-litre tank. An estimated 70% cut in energy costs and gas consumption eliminated entirely.
-
27.20 kWp in Viseu: the MO Cozinhas solar project in numbers
27.20 kWp of solar at an industrial facility in Viseu. 36% of demand met by on-site generation, a 29% lower electricity bill and 335 tonnes of CO₂ avoided over the system's lifetime.