Acampamento Baptista - solar self-consumption, EV charging and efficiency
Integrated energy solution at a tourism and accommodation facility: 16 kWp of solar, 22 kW EV charging and efficiency measures, installed in a single day and built to grow.
Sustainability makes more sense when it is woven naturally into everyday life. At Acampamento Baptista, the goal was not only to cut consumption, but to build an infrastructure ready to grow - more efficient and aligned with a long-term vision.
A space built to welcome people, now also built to manage its energy better.
Located in Água de Madeiros, Acampamento Baptista regularly hosts groups and activities that demand comfort, reliability and an efficient use of resources. The need was to modernise the energy infrastructure and build a solid base for future requirements.
The challenge
Deliver several complementary solutions in a short window, ensuring a fast execution without compromising quality or the normal running of the facility.
- 16 kWp installed photovoltaic power
- 22 kW EV charging power
Design and installation
Enbiente developed an integrated solution, sized to grow with the future energy needs of Acampamento Baptista. The work was completed within a single day, ensuring a fast and efficient implementation.
- 16 kWp photovoltaic system
- 20 kW SMA Solar inverter ready for future expansion
- Monitoring and energy-management system to optimise consumption
- Forced-ventilation system for greater efficiency and thermal comfort
- 22 kW Wallbox Pulsar Plus charger on a three-phase connection
The result
Acampamento Baptista now runs on a more efficient energy infrastructure, ready to meet current and future needs. Self-generated energy, combined with intelligent monitoring and the efficiency measures put in place, reduces grid dependence and reinforces a commitment to a more sustainable operation. More than an installation, this project laid the groundwork for smarter, future-ready energy growth.